Heck's Kitchen
An upgrade from how hellish things were yesterday. The installer arrived way early and got busy tearing out the old stuff. First the bar countertop went:
Then the other countertops. The original backsplash is still in place at this point:
I had to move even more stuff out of some cabinets. Floor space in the den is now at a premium:
The kitchen looks kind of naked with the countertops, backsplash, and harvest gold sink gone:
Installer fits backspash around the window, where the seam is supposed to be. The laminate people originally had the seam halfway between window and den wall. The installer is very efficient, skilled, and organized:
Microwave and stove had to be pulled out. Notice the backsplash is leaning at an angle? Despite all the fancy laser measurements, whoever cut the backsplash made this part too big (their second measurement error). The installer had to fix what the laminate people screwed up. Luckily he had the tools and know-how to fix it:
Anyhow, the kitchen is now half-done and should be finished tomorrow. Power is out in the kitchen, but we have an extension cord running to the microwave and refrigerator.
The kitchen saga will continue tomorrow.
~
4 Comments:
Progress was made so that's good. Will stay tuned!
Di
Good luck!
The funny part will be when you go to put things back...somehow I always seem to have more than I started with!!
Patience, it will be worth it in the long run!
At least you've got a great excuse to go out to eat!
Post a Comment
<< Home